It was on such ground that Pertamina EP was established on 13 September 2005. Then on 17 September 2005 PT Pertamina (Persero) signed a Production Sharing Contract (PSC) with BPMIGAS, governing all oil and gas mining areas accordingly. Eventually, majority of those areas became Pertamina EP's working areas. At the same time, Pertamina EP also signed a Production Sharing Contract with BPMIGAS valid since 17 September 2005.
Therefore, Pertamina EP’s working areas are those previously managed by PT Pertamina (Persero), including those previously managed by PT Pertamina (Persero) through Technical Assistance Contract (TAC) and Joint Operating Body Enhanced Oil Recovery (JOB EOR)
Due to expand our business and to achieve our production target rapidly, we are seeking highly qualified experienced candidates for the following positions :
Recruitment for Diploma Degree (D3) 2012
Closing Date : 10 February 2012
Requirements:
- Indonesian Citizen (WNI), domiciled in Jawa Barat based on valid ID Card
- Education D3 from accredited university majoring in Chemical Engineering (TKM), Electrical Engineering (Power Lines) (TKE), Petroleum Engineering (TKP), Mechanical Engineering (TMS), Civil Engineering (TKS), Information Engineering (TKI), Physics Instruments (FIN), Social Sciences (ISO), Economic Management (IEK), Accounting (AKT)
- Minimum GPA 3.00
- Maximum age 24 years as per 21 November 2012
- Physically and mentally healthy, with minimum height 160 cm
- Not color blinded
- Well behaved, evidenced by Certificate of Good conduct from the competent authorities
- Drug free, evidenced by personal statement and stamped Rp. 6.000
For those interested candidates, further information can be found in the following link:
Detailed Info